BMW | 2020 Beijing Motor Show

BMW | 2020 Beijing Motor Show

Client | Contracting Entity: BMW AG
Planning | Implementation: metron china
Project Management: Conex GmbH
Event Site: New China International Exhibition Center (NCIEC) Beijing

Scope metron china:

  • Assembly / disassembly
  • Conventional stand construction
  • Logistics
  • Exhibits
  • Ground floor exhibition area: 1.350 m²
  • Upper floor:  466 m²

Special Feature:

  • Special logistical challenge
  • Coordination of materials from the locations in Germany and China
  • Efficient use of existing stock

Rolls-Royce | 2020 Beijing Motor Show

Rolls-Royce | 2020 Beijing Motor Show

Client | Contracting Entity: BMW AG
Construction | Production: metron eging, metron china

Event Site: New China International Exhibition Center (NCIEC) Beijing

Scope:

  • Assembly / disassembly
  • Conventional construction
  • Ground floor exhibition area: 351 m² 
  • Upper floor:  96 m² 

Special Feature:

  • Special logistical challenge
  • Coordination of materials from the locations in Germany and China
  • Efficient use of existing stock